News View Home

News

  • POPS-B project Status: B245 civil engineer

    POPS-B project Status: B245 civil engineer

    B245 construction is completed Also On At CERN

  • FGClite

    FGClite

    Pre-series of the new radiation-tolerant power converter controller (FGClite) have been received at CERN, assembled and tested in the dedicated racks. Pre-series of the new radiation-tolerant power converter controller (FGClite) have been received at CERN, assembled and tested in the dedicated racks. The FGClite and its software are being validated in the CERN’s unique A7…

  • EPE’15 ECCE – Europe

    EPE’15 ECCE – Europe

    from 8 to 10 September 2015 at CERN Also On At CERN