News

New power converters will soon be installed in the HL-LHC IT String

The power converters HL-LHC2kA-10V are four-quadrant linear and modular converters that can provide voltages ranging from -10 volts to 10 volts and currents ranging from -2000 amperes to 2000 amperes...

At CERN
04 September, 2023

Successful prototype validation of ultra-high precision current measurement devices for HL-LHC

The WP6B “Class 0” ultra-high precision current measurement devices, or DCCTs (direct current current transformers), are used for the accurate current measurement/regulation in the 14kA (D1: MBXF, D2: MBRD) and 18kA (Main Inner Triplet) power converters..

At CERN
13 May, 2022

Powering for a sustainable future

CERN’s transfer lines are undergoing significant renovations to make them more energy efficient while delivering high-quality beams reliably to experiments, write Konstantinos Papastergiou and Gilles Le Godec.

At CERN
10 March, 2022

Current/field control of the PS-Booster main magnets power converters

The PSB main magnets are powered by 28 power converters following the schematic represented in fig1. The fact that all circuits are magnetically coupled among each others, makes the control of these power converters very difficult, as any modification...

At CERN
13 July, 2021

PS Main Power Supply

POPS supplies the PS magnets without drawing all the power from the network. The maximum stored energy in the magnets is 14MJ. This energy is supplied by the capacitor banks (CS)...

At CERN
30 March, 2021
At CERN
30 March, 2021

HL-LHC2kA-10V Power Converters

HiLumi LHC project requires 36 four quadrant linear converters to trim the inner triplets magnets currents Q1 & Q3, and to power orbit correctors magnets of Q1, Q2, Q3 located in the new areas UR15 (16 units) and UR55 (16 units).

At CERN
11 March, 2021
At CERN
11 March, 2021

R2E-LHC600A-10V Power Converters

In the frame of the LHC-consolidation project, 104 radiation tolerant converters haven been produced to replace the old LHC600A-10V power sources located in the irradiated areas RR1x, RR5x and RR7x

At CERN
11 March, 2021
At CERN
11 March, 2021

EPE'15 ECCE - Europe

At CERN
01 January, 2015
At CERN
01 January, 2015

FGClite

At CERN
03 May, 2016
At CERN
03 May, 2016

POPS-B project Status: B245 civil engineer

B245 construction is completed

At CERN
10 June, 2016