which took place in Modena (Italy), from 13 to 16 September. (Image: Matteo Di Cosmo/CERN)
In the frame of CERN Proton Synchrotron (PS) consolidation upgrade, a new power converter has been developed to supply the tetrodes of the 40 MHz and 80 MHz radio frequency (RF) cavities.
B245 construction is completed